Date/Time
Date(s) - 07/01/2025 - 09/01/2025
9:00 am - 4:00 pm
Categories
LATAR BELAKANG :
- Merupakan salah satu masalah lubang sumur di operasi pemboran
- Menyebabkan timbulnya biaya ekstra yang cukup besar
- Berpotensi menyebabkan hilangnya sebagian atau semua fasilitas pemboran di lapangan karena kick dan blow out yang tidak terkontrol
- Menunda waktu produksi sumur (POP)
SASARAN :
- Mengetahui gejala kejadian kick dan blow out.
- Mengetahui kerugian akibat kick yang tidak terkontrol atau blow out.
- Mengetahui usaha pencegahan terjadinya blow out.
- Mengetahui cara mengidentifikasi mekanisme kick yang terjadi.
- Mengetahui kronologi terjadinya kick dan blow out dan cara penanggulangannya dengan Well Control.
PESERTA TRAINING :
Operator/ Sr. Operator/ Jr. Engineer/Non Engineer
MATERI TRAINING :
Well Control Introduction
- Introduction to course
- Basic Concepts
- Liquid Hydrostatics
Gas Behavior and Hydrostatics
- Ideal Gases
- Effect of Temperature
- Real Gases
- Critical Temperature & Pressure
- Pseudo-Critical Temp. and Press.
- Gas Compressibility
- Gas Migration
Kick and Gas Migration
- Density of real gasses
- Equivalent Mud Weight (EMW)
- Wellbore pressure before and after kick
- Gas migration rate – first order approx.
- Gas migration rate – w/mud compressibility
Gas Solubility
- Solubility of Hydrocarbon Gasses in Oil
- Solubility of Non-Hydrocarbon Gasses in Oil
- Solution Volume Factors
- Oil Mud Recommendations
Pore Pressure Prediction
- Mud Weight and Pore Pressure
- Mud Weight and Fracture Gradient
- Normal Pore Pressure
- ubnormal Pore Pressure
- Abnormal Pore Pressure
- Origins of Pore Pressure
- Bulk Density and Porosity vs. Depth
Drilling Rate and Pore Pressure
- Forces on Subsurface Rock
- d-exponent
- dc-exponent
- Rehm and McClendon
- Zamora
- Comb’s Method
- Bourgoyne and Young’s Method
Other Indicators of Abnormal Pore Pressure
- Moore’s Equation – Drilling rate
- Gas in the Drilling Fluid
- Rock Sample Characteristics
- Use of Surge and Swab Pressure to determine Overbalance
- Changes in Drilling Fluid Properties
- Temperature Indications
- Hole Conditions
Logging While Drilling
- Sonic Travel Time
- Resistivity and Conductivity
- Eaton’s Equations (R, C, Dt, dc)
- Natural Gamma Ray
Fracture Gradients 1
- Allowable Wellbore Pressures
- Rock Mechanics Principles
- Hooke’s Law, Young’s Mudulus, Poisson’s Ratio
- Volumetric Strain, Bulk Modulus, Compressibility
- Triaxial Tests
- Rock Mechanics Principles (con’t.)
- Rock Properties from Sound Speed in Rocks’
- Mohr’s Circle
- Mohr-Coulomb Failure Criteria
Fracture Gradients 2
- Radial and Tangential Stresses near the Wellbore
- Stresses in Rock near Wellbore
- Effect of Anisotropic Stresses
- Onshore vs. Offshore Fracture Gradients
- Fracture Gradients in Inclined Wellbores
- Oil Based and Water Based Drilling Fluids
Fracture Gradients Determination
- Hubbert and Willis
- Matthews and Kelly
- Ben Eaton
- Christman
- Prentice
- Leak-Off Test (experimental)
Kick Detection and Control
- Primary and Secondary Well Control
- What Constitutes a Kick
- Why Kicks Occur
- Kick Detection Methods
- Shut-in Procedures
- Soft and Hard Shut-in
- Water Hammer
Off Bottom Kick
- Slugging of drillpipe
- Hole fill during trips
- Surge and Swab pressures
- Kick detection during trips
- Shut-In Procedures
- Blowout Case History
Control Pressures and Circulation Kill Techniques 1
- Shut-In Pressures
- Weighting Up the Mud
- Driller’s Method
- Wait & Weight Method
Control Pressures and Circulation Kill Techniques 2
- Wait & Weight Method
- Concurrent Method
- Annulus Pressure Profiles
- Kicks in Oil-Based Mud
Secondary Well Control Complications
- Volumetric Well Control
- Lubrication
- Complications During Conventional Kill
- Techniques to Reduce Annular Friction
Special Well Control Applications
- Underbalanced Drilling
- Well Control in Unconventional Hole Programs
- Casing and Cementing Operations
Equipments
- High Pressure Equipment
- Control System Equipment and Design
- BOP Inspection and Test Considerations
- Low-Pressure Equipment
- Equipment Arrangement: Design and Philosophy
- Casing
- Casing Heads and Spools
- Stack Equipment
- Choke and Kill Line Equipment
- Drillstem Control Equipment
Offshore Operations
- Equipment Used in Floating Drilling
- Operational Considerations in Floating Well Control
- Shallow Gas Hazards
- Trends in Deepwater Drilling
TRAINER
CITRA INTI TRAINING consultant team
DURATION OF TRAINING
3days (effective21thhours )
TRAINING METHOD
Interactive Methods, Presentations, Discussions
INVESTMENT TRAINING (Excluding Accommodation) :
- IDR 9.500.000,-/participant (Jakarta)
- IDR 9.500.000-/participant (Bandung)
- IDR 9.500.000,-/participant (Yogyakarta)
- IDR 11.000.000,-/participant (Bali)
- IDR 11.000.000,-/participant (Lombok)
- US$ 3.750/participant (Malaysia)
Webinar via zoom atau aplikasi lain yang disepakati
- Rp 7.500.000 / participant
Inhouse Training :
- Melalui pengajuan proposal kami berisikan beberapa ketentuan yg disepakati oleh kedua belah pihak.
- Nilai investasi training lebih murah
Quota minimal peserta :
- Offline / tatap muka : 2 – 3 peserta
- Online / webinar : 1 – 2 peserta
- Inhouse Training : 5 – 10 peserta
Keterangan lain :
- Jadwal dan lokasi training bersifat fleksibel, dapat disesuaikan melalui kesepakan peserta.
FASILITAS
Training Offline / Tatap muka :
- Sertifkat, Modul + Soft Copy, Training Kit, Lunch, Coffee Break, Jaket/tas dan diselenggarakan di hotel berbintang
Training Online / Webinar via zoom atau aplikasi lain :
- Sertifkat, Modul Soft Copy
Inhouse Training :
- Sertifkat, Modul + Soft Copy, Training Kit, Lunch, Coffee Break, Jaket / tas
INFORMASI DAN PROMO (WA)
|
CONTACT PERSON (SMS Center) dan WA
|
E – mail & Web site :
-
-
- citra.inti06@gmail.com
- citra.inti.training@gmail.com
- www.cit-system.com
-
JADWAL TRAINING TAHUN 2025 :
Januari
|
Februari
|
Maret
|
April
|
Mei
|
Juni
|
Juli
|
Agustus
|
September
|
Oktober
|
November
|
Desember
|