Date/Time
Date(s) - 25/12/2024 - 27/12/2024
9:00 am - 4:00 pm
Categories
OBJECTIVES:
- Understand the basic concepts of reservoir engineering
- Understand the basic calculations of the reserve and recovery of an oil or gas reservoir
- Understand the techniques and procedures of sand control, acidizing, and hydraulic fracturing to increase recovery from a reservoir
- Understand the basics of oil and gas flow behavior in reservoir
- Knowledge of Enhanced Oil Recovery purpose and techniques
AUDIENCE:
Reservoir Engineer, Geologists, Project Engineers, Production Supervisors and Engineers, Well Service Supervisors and Engineer, Workover Supervisors and Engineers, etc.
COURSE OUT-LINE:
Oil & Gas Reservoir
- Accumulation of Organic Material in Sediment
- Organic Accumulation Environment
- Oil & Gas Existence in Reservoir
Reservoir Fluid & Rock Properties
- Porosity
- Permeability
- Reservoir Parameter Measurement
- Oil Components
- Oil Phase
- Phase Behavior
Fluid Distribution in Reservoir
- Wettability
- Surface Tension
- Capillary Pressure
- Fluid Distribution
Reservoir Driving Mechanism
- Water drive
- Depletion drive
- Gas cap drive
- Combination
Reserve Estimation & Recovery Factor
- Estimation of oil-gas in place
- Estimation of reserve
- Estimation of recovery factor
Reserve Estimation & Decline Curve
- Volumetric Method
- Material Balance Method
- Saturated Reservoir
- Undersaturated Reservoir
- Gas Reservoir
- Decline Curve
Basic of Fluid Flow
- Darcy Law
- Fluid Viscosity
- Fluid Compressibility
- Reservoir Fluid Flow
- Poiseuilles Capillary Law
- Productivity Index
- Zonal damage and well stimulation
Formation Evaluation
- Purpose of Formation Evaluation
- Formation Evaluation Method
- Logging Equipment
- Log Analysis
Well Testing
- Pressure Build Up testing
- Pressure Draw Down testing
- Production Testing
Acidizing
- Basic Acidizing
- Acidizing Types
- Acidizing Considerations
- Acid in Stimulation
- Acidizing Design
Hydraulic Fracturing
- Damage around Wellbore
- Fracturing Considerations
- Rock Properties & Measurement
- Fracture Geometry
- Fracturing Operation Design
- Case Problem
Enhanced Oil Recovery (EOR)
- Water flooding
- Thermal
- Chemical
- Miscible flooding
Field Management
TRAINER
CITRA INTI TRAINING consultant team
DURATION OF TRAINING
3 days (effective 21th hours )
INVESTMENT TRAINING (Excluding Accommodation) :
- IDR 9.500.000,-/participant (Jakarta)
- IDR 9.500.000-/participant (Bandung)
- IDR 10.500.000,-/participant (Yogyakarta)
- IDR 12.500.000,-/participant (Bali)
- IDR 12.750.000,-/participant (Lombok)
- US$ 3.780/participant (Malaysia)
Webinar via zoom atau aplikasi lain yang disepakati
Rp 7.500.000 / participan
FASILITAS
Training Tatap muka
- Sertifkat, Modul + Soft Copy, Training Kit, Lunch, Coffee Break, Jaket dan diselenggarakan di hotel berbintang
Training Webinar via zoom atau aplikasi lain
- Sertifkat, Modul Soft Copy
INFORMASI DAN PROMO (WA)
|
CONTACT PERSON (SMS Center) dan WA
|
E – mail & Web site :
-
-
- citra.inti06@gmail.com
- citra.inti.training@gmail.com
- www.cit-system.com
-
JADWAL TRAINING TAHUN 2024 :
Desember
|
JADWAL TRAINING TAHUN 2025 :
Januari
|
Februari
|
Maret
|
April
|
Mei
|
Juni
|
Juli
|
Agustus
|
September
|
Oktober
|
November
|
Desember
|
We receive are request time,place and facilities. Open Schedule for min 3 participant. For get detail information please don’t hesitate to contact us.