Basic reservoir engineering is a branch of petroleum engineering that focuses on maximizing the economic recovery of oil and gas from subsurface porous rocks. Practitioners estimate how much hydrocarbon is trapped underground, predict production rates, and design recovery methods.
OBJECTIVES:
- Understand the basic concepts of reservoir engineering
- Understand the basic calculations of the reserve and recovery of an oil or gas reservoir
- Understand the techniques and procedures of sand control, acidizing, and hydraulic fracturing to increase recovery from a reservoir
- Understand the basics of oil and gas flow behavior in reservoir
- Knowledge of Enhanced Oil Recovery purpose and techniques
Reservoir Engineer, Geologists, Project Engineers, Production Supervisors and Engineers, Well Service Supervisors and Engineer, Workover Supervisors and Engineers, etc.
COURSE OUT-LINE:
Oil & Gas Reservoir
- Accumulation of Organic Material in Sediment
- Organic Accumulation Environment
- Oil & Gas Existence in Reservoir
- Porosity
- Permeability
- Reservoir Parameter Measurement
- Oil Components
- Oil Phase
- Phase Behavior
- Wettability
- Surface Tension
- Capillary Pressure
- Fluid Distribution
- Water drive
- Depletion drive
- Gas cap drive
- Combination
- Estimation of oil-gas in place
- Estimation of reserve
- Estimation of recovery factor
- Volumetric Method
- Material Balance Method
- Saturated Reservoir
- Undersaturated Reservoir
- Gas Reservoir
- Decline Curve
- Darcy Law
- Fluid Viscosity
- Fluid Compressibility
- Reservoir Fluid Flow
- Poiseuilles Capillary Law
- Productivity Index
- Zonal damage and well stimulation
- Purpose of Formation Evaluation
- Formation Evaluation Method
- Logging Equipment
- Log Analysis
- Pressure Build Up testing
- Pressure Draw Down testing
- Production Testing
- Basic Acidizing
- Acidizing Types
- Acidizing Considerations
- Acid in Stimulation
- Acidizing Design
- Damage around Wellbore
- Fracturing Considerations
- Rock Properties & Measurement
- Fracture Geometry
- Fracturing Operation Design
- Case Problem
- Water flooding
- Thermal
- Chemical
- Miscible flooding
TRAINER
CITRA INTI TRAINING consultant team
DURATION OF TRAINING
3days (effective21thhours )
INVESTMENT TRAINING (Excluding Accommodation) :
- IDR 9.500.000,-/participant (Jakarta)
- IDR 9.500.000-/participant (Bandung)
- IDR 10.500.000,-/participant (Yogyakarta)
- IDR 12.500.000,-/participant (Bali)
- IDR 12.750.000,-/participant (Lombok)
- US$ 3.780/participant (Malaysia)
Rp 7.500.000 / participan
FASILITAS Training Tatap muka
- Sertifkat, Modul + Soft Copy, Training Kit, Lunch, Coffee Break, Jaket dan diselenggarakan di hotel berbintang
- Sertifkat, Modul Soft Copy
INFORMASI DAN PROMO (WA)
|
CONTACT PERSON (SMS Center) dan WA
|
JADWAL TRAINING TAHUN 2026 :
Januari
|
Februari
|
Maret
|
April
|
Mei
|
Juni
|
Juli
|
Agustus
|
September
|
Oktober
|
November
|
Desember
|
Training Basic Reservoir EngineeringWe receive are request time,place and facilities. Open Schedule for min 3 participant. For get detail information please don’t hesitate to contact us.






